Base and landing preparation

Pits, thresholds & waterproofing.

Concrete, infill and tanking work that prepares the lift pit and landing interfaces for safe, accurate installation.

Built to the requirement

Accurate levels and suitable backgrounds.

The pit and entrance thresholds are critical interfaces between the building and the lift installation.

We coordinate dimensions, materials, preparation and curing requirements so the area is ready when engineers return.

01 / PIT ALTERATIONS

Local construction work

Adjustments, infills and preparation required around the base of the shaft.

02 / CONCRETE

Thresholds and plinths

Formed concrete work to agreed heights, widths and installation requirements.

03 / INFILLS

Redundant voids and openings

Controlled filling and reinstatement using suitable materials and preparation.

04 / TANKING

Water-resistant treatment

Preparation and application of agreed waterproofing systems to lift pits.

05 / PUMP SUPPORT

Associated builder’s work

Construction preparation around agreed pit pumping or drainage arrangements.

06 / HANDOVER

Clean and installation-ready

Area checked, cleared and handed back at the required programme stage.

Before work starts

Information we need.

  • Required finished levels and dimensions
  • Lift contractor’s interface details
  • Known water ingress or substrate issues
  • Access and material handling route
  • Required completion and curing window

Get the base and thresholds ready for installation.