Structural preparation

Shaft & entrance alterations.

Practical construction work to prepare, form and adjust the building interfaces needed for lift replacement and modernisation.

Accurate interfaces

Building work coordinated to the lift design.

Openings, walls and structural details must align with the lift contractor’s requirements and the existing building.

We review drawings and site conditions, coordinate dimensions and deliver the necessary work in the sequence required by the installation team.

01 / OPENINGS

Forming and adjustment

Creating or modifying lift entrance openings to agreed sizes and levels.

02 / MASONRY

Blockwork and infills

New walls, local rebuilding, infilling and adjustment around lift shafts and entrances.

03 / PARTITIONS

Stud and board systems

Fire-rated or general partitions, shaft interfaces and local enclosures.

04 / SUPPORT

Lintels and structural details

Installation support work following the project design and agreed specification.

05 / CUTTING

Controlled alteration

Planned cutting and breakout coordinated around noise, dust and structural constraints.

06 / REINSTATEMENT

Ready for the next trade

Making safe, clearing and preparing the interface for lift installation or finishing.

Plan the alteration

Measure twice. Coordinate once.

  • Site conditions checked against information supplied
  • Dimensions and responsibilities agreed
  • Access, noise and dust controls planned
  • Work handed over at the required installation stage

Prepare the building for the lift installation.

Speak to Oracle Builders about openings, shaft interfaces and coordinated alterations.