Finishing works

Lift entrance making good.

Careful reinstatement and finishing around new landing doors so the completed installation sits properly within the building.

The final interface

From installation opening to finished entrance.

Even a technically successful lift replacement can look unfinished when the construction around the landing doors is poorly resolved.

Our multi-trade approach allows the plastering, carpentry, trims, sealants and decoration to be coordinated as one finishing package.

01 / BACKGROUNDS

Boarding and preparation

Forming suitable backgrounds, packing, repairing reveals and preparing disturbed surfaces.

02 / PLASTERING

Reveals and wall finishes

Beads, base preparation, plaster repairs and smooth finishing around entrance frames.

03 / CARPENTRY

Skirtings, trims and boxing

Neat reinstatement of skirtings and construction of suitable trims or local boxing.

04 / SEALING

Junctions and interfaces

Clean, controlled sealing at frames, trims and adjacent finishes where specified.

05 / DECORATION

Prepared and painted

Filling, sanding, mist coats and finish coats to blend the new work with its surroundings.

06 / QUALITY

Landing-by-landing checks

Consistent finishes inspected across every level before final handover.

Coordinated finish

Fewer trades. Clearer responsibility.

Using one team for the complete entrance finish avoids gaps between plastering, carpentry and decoration and makes programme coordination easier.

  • Works sequenced around completed lift entrances
  • Frames and equipment protected
  • Existing finishes matched where practical
  • Snagging completed before handover