Passive fire protection

Fire stopping & compartmentation.

Fire stopping around lift entrances, shaft junctions and service penetrations. We install the specified systems and record the location, products and completed work.

Fire stopping around lifts

Fire stopping with installation records.

Lift replacement and building alterations can leave gaps in fire-resisting walls and floors. These need to be checked against the project’s fire-stopping details.

We prepare the opening, install the agreed system and keep photographs and product records. If the site conditions differ from the specified detail, we raise the issue before proceeding.

01 / REVIEW

Check the opening

Check the opening, substrate, services and gap against the specified installation detail.

02 / PREPARATION

Preparing the surfaces

Remove loose material and debris, then prepare the surfaces for the agreed system.

03 / INSTALLATION

Specified products and details

Install compatible products to the specified detail and the manufacturer’s requirements.

04 / LIFT INTERFACES

Entrances and shaft areas

Seal the agreed gaps at lift entrances, shaft junctions and service penetrations.

05 / RECORDING

Photos and product records

Record the location and products used, with photographs of the installation.

06 / HANDOVER

Installation records

Provide the agreed installation records so the project team can identify the completed work.

Quality control

Fire performance depends on the detail.

  • Correct product system confirmed before use
  • Substrate and opening prepared correctly
  • Installed depth and arrangement checked
  • Photographic records retained
  • Variations raised rather than improvised