Pit alterations and infills
Carry out the agreed alterations, infills and preparation at the base of the lift shaft.
Lift pit alterations, concrete thresholds, infills and tanking. We prepare the building to the lift contractor’s dimensions, levels and installation requirements.
Pit depths, finished levels and threshold dimensions need to be right before the lift equipment is fitted. Existing concrete and any water ingress also need to be considered.
We agree the work, materials and curing time with the lift contractor so the pit and landings are ready for the next stage.
Carry out the agreed alterations, infills and preparation at the base of the lift shaft.
Form concrete thresholds and plinths to the dimensions and finished levels provided.
Fill redundant voids and openings using the agreed materials and preparation.
Prepare lift pit surfaces and apply the specified tanking or waterproofing system.
Carry out the agreed builders’ work for pit pumping and drainage arrangements.
Check and clear the area before handing it back to the lift team.